Case Studies

We work closely with our clients ensuring that their orders arrive on time. Here are some case studies and they’re saying some very nice things about us…

 

____________________________________________________________________________________________________________________________________________________________________________

 

 

 

 

“Tried 3 different suppliers and all came up short for a ‘complete’ delivery. Unlike the others you have contacted site and come up with a solution going above and beyond others. Much appreciated.”

Robert Turnbull, Essex Services Group plc

 

 

 

Wates emergency delivery – click here

 

Project: 2 London Wall, London for arc Major Projects

 

“It was late in the evening when I received a call that one of my projects at London Wall needing some materials on site first thing in the morning as a matter of urgency.

 You can imagine what sort of problems this would have caused me under normal circumstances with ordering first thing the next day, waiting for purchase order numbers and then waiting for the delivery to be despatch and arrive in the city centre.

 One call to emu24 meant my goods were organised, dispatched and was on site for 7:30am the next morning.

 The impact and knock-on effect that service had was invaluable. This has happened on several occasions, from delivering materials to site at late notice, organising manufacturing of purpose made trestles and also arranging collecting of materials of site within the hour, on the request to assist a good client of ours’’

 Ian Palin, Managing Director, arc Major Projects

 

______________________________________________________________________________________________________________________________________________________________

 

Complete Workspace

 

“I have been using emu24 for about a year now and I would highly recommend there services to any tradesman. I think it’s a great idea as a 24 hour suppliers. Our workforce work days and nights and it’s impossible to get materials out of hours but emu24 have made this possible.

Their prices are very competitive and materials have always been delivered on time in and out of hours. It’s great to use the advantage of the 24 hour service as they have got us out of trouble a few times especially when the night shift have needed materials out of hours.

All the staff at emu24 are very friendly and it’s a pleasure to use them”.

Alan Graves, Complete Workspace

 

_______________________________________________________________________________________________________________________________________________________________

 

arc Group

 

“From the first order I placed with EMU24 there has always been an excellent service with a vast range of product knowledge and attention to detail.

 Always providing an outstanding customer/supplier relationship and fast response. Coupled with an amazing 24 hour tracked delivery service including updates at every stage.

 Simply put, a first class company!”

Ryan Lane, Procurement Manager, arc Group

 

_______________________________________________________________________________________________________________________________________________________________

arc M&E

 

“I would like to thank you for today and last week with the Bedford Square project.

All the work has been completed today ready for UKPN to power up tomorrow. Where credit is due,  you and emu24 helped me out last week when we had to adapt the containment last minute and change the cable size etc. Service was second to none.

Much appreciated”.

Matt, Managing Director, arc M&E

 

_____________________________________________________________________________________________________________________________________________________________

 

Morgan Sindall

 

EAST LONDON TOWER BLOCK SUFFERS COMPLETE POWER FAILURE

On the 24th July 2017, water had leaked into the main electricity head of a tower block in East London, blowing the power to the entire block.

A client of emu24, Morgan Sindall called in at 7:45pm requesting 70mm cable so they could get the power back on into over 50 homes.

For those in the industry you will know the biggest challenge with this predicament isn’t trying to calm down the residences of over 50 homes because they are submerged in complete darkness, but it is 1, trying to find a supplier that is open later than 5pm and 2, finding one that will have the right stock available to resolve the issue.

At 10:30pm, emu24 arrived on site with the materials needed for Morgan Sindall to complete their works.